Primarily, the book “Waltzing with Bears” offers
valuable insights about risk management techniques and how they can be applied.
However, chapters 5, 6, and 7 deviate from the theme a little to talk about
scenarios where risk management techniques cannot be employed (For example:
‘can-do’ attitude of an organization).
Chapter
5 adopts a very pragmatic approach towards risk management and explains various
such circumstances where risk management is avoided. For instance, stakeholder
might not take up the project if he/she knew the risks involved. The author
also talks about organizations that advocate the “manage for success” approach
and that it is difficult for one person to swim against the tide and promote
risk management in such an organization.
Chapter
6 further elaborates on the “uncertainty” factor in certain corporate cultures
that accept failures and delays but not uncertainties. Such an approach thwarts
risk management efforts. The result is that such organizations concentrate on
selective minor issues while large problems are blindly ignored and taken off
the risk list, the consequences of which usually cataclysmic to the project.
This can be avoided by tracking the risks that are crucial to the project from
effect to cause, along with other minor issues.
Chapter
7 explains that when listing the risks, there are some risks that are dependent
on sheer luck and which cannot be incorporated in the list of risks impacting a
project. The example the author quotes is that of an “asteroid demolishing the
company”. From personal experience, I can share one such instance. During the
coding phase of my project in my previous organization, when the team size
increased to 60, we were shifted to another building so that the entire team
could be seated together. About 2 weeks after the shift, there was a downpour,
which flooded the basement of the building and damaged the servers and
generators in the building. As a result, the entire team was not able to do any
work for 3 days till the servers and generators were restored. The project went
off-schedule.
So
basically, the absence of 1-2 people in the team can be handled using risk
mitigation strategies like padding the schedule but the absence of an entire
team of 60 for 3 days (more than 1000 hours of effort) is not foreseeable and
hence cannot be
planned for in advance when estimating the delivery dates for a project. But
that does not imply taking chances with all the risks as the author concludes. Proper
risk management strategy requires every risk to be evaluated before taking it
off the list.
Risk management is essential for making informed decisions and ensuring stability in the face of uncertainty. It involves identifying, assessing, and proactively addressing potential risks to achieve long-term success.